
“The House That Jack Built”
Week 23-Third Corner of Painting
As with the posting of the first and second corner of the painting, while there is considerable progress in this corner, there are still areas/objects that will be revisited and finalized.
Hands and numbers still to be added to the cuckoo clock, red or white wine?, plus the “Alligator Tail” label, changing the stance of the music-box ballerina as well as adding hummingbirds and the finalizing the turtle’s shell etc.
The detail work has been slowing the process down but the painting is still moving along.
The continuing posting schedule for the project is, as laid out:
Today, Monday, December 1; “Third Corner Painting”.
Monday, December 8 and following Monday’s; Post continuing progress images of “The House That Jack Built” painting.
Art notes:
All images and text are copyright Craig L Haupt
Postings of “The House That Jack Built” are every Monday Evening.
Postings are made to:
FaceBook: Craig L Haupt, to follow “Like” the “Home Page”
WordPress Blog: http://www.craiglhaupt.com Sign up to “Follow”
LinkedIn: Craig L Haupt, “invite to connect” to receive posts